2431 Guenette Street, St-Laurent, Québec, H4R 2E9 514-337-0566

Shop

EQ: Energy Efficiency Program

A PERFORMANCE & FINANCIAL COMPRESSED AIR SYSTEM ANALYSIS

WHAT’S YOUR EQ?

EQ stands for Efficiency Quotient:
• Industry standard for evaluating the overall efficiency of your compressed air system
• Innovative, patented method
• Based on proven “Best Practice” solutions

 

WHAT’S THE BENEFIT OF A HIGH EQ RATING?

Optimizes your compressed air system:
• Reduces energy consumption
• Stabilizes system pressure
• Improves system performance
• Enhances product consistency
• Improves plant productivity

 

THE EQ ANALYSIS IS A 3-STEP PROCESS

• Determine Existing EQ Rating with a free plant walkthrough
• Conduct EQ Analysis to quantify cost-reduction opportunities
• Evaluate EQ Analysis report and Action Plan to reduce operating costs

 

STEP 1 – DETERMINE YOUR EXISTING EQ RATING

Your Quincy representative will conduct a free walkthrough and complete the EQ Rating worksheet included in this brochure. This does more than just identify your existing EQ Rating, it estimates your current compressed air system operating costs and your cost reduction potential.

 

STEP 2 – CONDUCT QUINCY EQ ANALYSIS

• A trained Quincy representative will come on-site and connect the EQ Analyzer.
• The EQ Analyzer records the power and performance of the compressors and air pressure levels in your compressed air system during normal production.
• The recorded data combined with information gathered from plant personnel and observation will then be analyzed.

 

STEP 3 – DELIVER QUINCY EQ ANALYSIS REPORT AND ACTION PLAN

• Financial projections include a payback calculation on the recommended Action Plan and capital investment.
• System performance graphs and tables provide details on existing and proposed system performance.
• The Action Plan details the specific recommendations and estimated costs to raise your system’s EQ.

Downloads

Quincy EQ Brochure – English

Description

Financial Summary *
Constituents Existing Proposed Variance
Electricity $ 170,853 $113,144 $ 57,710
Maintenance & Repairs 15,000 9,000 6,000
Cooling Water  5,125 3,394 1,731
Rental Compressors 4,500 0 4,500
Miscellaneous 0 0 0
TOTAL $ 195,478 $ 125,538 $ 69,941
Estimated Retrofit Costs $ 122,740
Projected Annual Savings $ 69,941
Estimated Simple Payback 21 months

* Example of analysis and action plan